| No.6904670
- Product Categories
- Friendly Links
Chimney series
1 JHY-Y prefabricated stainless steel chimney
JHY-D stand-alone stainless steel chimney
3. JHY-F attached to the wall stainless steel chimney
JHY-Y prefabricated stainless steel chimney is mainly used for boilers, generators, cold-water heater, incinerator, air conditioning, direct combustion unit flue gas emissions. Prefabricated stainless steel chimneys are produced in strict accordance with national standard GB GB50051-2002 "chimney design specifications, reliable quality, wide range of uses. Can be applied to a variety of boilers, direct fired units and cold water heater, such as exhaust systems and diesel generator sets, burning furnace exhaust system and air conditioning systems industrial PLAMET system exhaust emission systems. It is not only weight than traditional chimney light 1/2 the price than the traditional chimney save 1/3.
Enter the market, that is, by design units and construction of all ages. This product is the modular structure of the split, according to the design and construction requirements, the production into any trend. Its material is SUS304 (OCr19Ni9), SUS316 (OCr17Ni14Mo2) stainless steel, can withstand the pressure of 0.15MPa of emissions from the medium temperature up to 800 ℃. Assembly in the chimney of each component inside and outside the tube, and insulation materials before leaving the factory as a whole, on-site installation, simply tighten the screws can be, no site welding, riveting, convenient, fast installation. Have the following characteristics: high temperature: according to the general boiler flue gas temperature <240 degrees, you can also set diesel generator set to 480 ° C -680 ° C high temperature, different properties of the high-pressure mineral wool, aluminum silicate, etc., of different thickness insulation materials, to ensure that the chimney outer wall of not more than 45 degrees (thermal specifications <60 degrees). Advanced connection technology: the introduction of the TFD process, saving valuable building space occupied by the traditional flange connection process, greatly improve building space utilization efficiency, to meet the conditions of the installation of the narrow shaft; advanced technology, reasonable structure, process stability, reliable; quality and long service life (expected 50 years) and usually do not need maintenance and repair; light weight, and stent combination of scientific and rational, and the site easy to install, quick; can greatly reduce labor intensity and lower installation costs. Ease of Installation: the difficult and complex process of fabrication and installation in a narrow shaft inside the high-altitude, workshop production, forming, transported to the site combination of installation, not only to simplify the installation process, but to ensure that the liner, insulation, shell and many link in the production of quality problems. At the same time, on-site combination installation made easy. The appearance of burnished crisp, not only can be used as the point of the mural chimney cease construction of the facade, and can reduce the value of the construction area due to the built-in chimney shaft possession.
This product is light weight, corrosion-resistant, long life, good thermal insulation effect, elegant appearance and simple installation. Can be built-in use, but also can be attached to the wall use, you can also use as a stand-alone chimney. Is the ideal product to replace the traditional cement chimney steel chimney.
Linen series of tube wells) of (dirty clothes
1.JHB-J mechanical Linen Bin
2.JHB-Z smart linen bin
Linen tube collection pipe system (also known as dirty clothes well, dirty linen, blanking wells) is the use of object weight for vertical transmission pipe attached to a building for the transmission of parcels a good dirty clothes, dirty sheets, dirty tablecloths to wait until underground temporary. Floors need to transfer the set to put in the mouth, to a level above the top level of the vertical pipe or side wall equipped with a snorkel, if necessary, set up a strong exhaust system and set up the elbow or outdoor rain cover, located at the bottom adjustable buffer tube and automatic fire door. System piping in addition to the outside of the stent, and the remaining are used austenitic stainless steel. Flashlight with automatic argon gas shielded arc welding, weld strength and appearance of smooth, dirty clothes well pipe is smooth and not linked to fiber. Ensure input from the delivery port of any layer of dirty clothes well, collect the mouth end of the pipe in the basement can be smooth and automatic outflow pipe outlet, using spinning molding strengthen the process, the cylinder strength increased 2.5 times to protect the pipeline have sufficient impact resistance.
Pipelines in various parts of the support made from carbon steel, and take a hot dip galvanized anti-corrosion measures to ensure long-term does not rust. The flange clamp flange connection, the connection is smooth, easy to install, no need to polish processing, to avoid pipe corrosion; all the components are prefabricated in the factory, shape, size standards, on-site installation convenient, fast; at the exit to do to strengthen the protection of buffering angle measures to ensure that the buffer effect. Life of dirty clothes well vertical pipe of not less than 30 years, and have sufficient stiffness and strength to ensure that the pipeline to sustain its long-term effective impact at the highest level of throwing dirty clothes well, will not undermine the stability of the system due to vibration, and does not produce a resonance, set pipe at the bottom of the buffer tube to prevent heavy objects fall wounding basement with goods exports and set to automatic fire doors. Closed to prevent the chimney effect, safety design structure to prevent bacterial cross-infection to eliminate the psychological impact of unsanitary.
keywords: Stainless steel chimneys, boilers, chimneys, dirty clothes well, cloth grass tube,
You are the 22294 visitor
Copyright © GuangDong ICP No. 10089450, River Industrial Co., Ltd. Shanghai Jun All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
